Search found 5 matches

by PixelSwitch
Thu Mar 25, 2021 3:51 pm
Forum: Flows
Topic: Job dismantler takes way too long
Replies: 2
Views: 2825

Re: Job dismantler takes way too long

Yes, I am dismantling from an auto-managed folder to an auto-managed folder and "Ungroup job" also couldn't help. But maybe I have found a mistake. The property "Strip unique name" of an "Assemble Job" element some steps before was set to "Yes". I don't know i...
by PixelSwitch
Wed Mar 24, 2021 10:55 am
Forum: Flows
Topic: Job dismantler takes way too long
Replies: 2
Views: 2825

Job dismantler takes way too long

Hi everyone, we are finally using Switch 2020 instead of Switch 13, but somehow we have problems with the job dismantler flow element in one certain flow. The job folder that arrives there is always named like this: 1234567_Daten There are always two PDF files, one XML file and several TIF files in ...
by PixelSwitch
Tue Mar 23, 2021 8:58 am
Forum: Applications
Topic: Converting CAD-files to another format with ArtiosCAD
Replies: 2
Views: 3941

Re: Converting CAD-files to another format with ArtiosCAD

That's what I was afraid of. Thank you for your quick answer freddyp!
by PixelSwitch
Mon Mar 22, 2021 2:50 pm
Forum: Applications
Topic: Converting CAD-files to another format with ArtiosCAD
Replies: 2
Views: 3941

Converting CAD-files to another format with ArtiosCAD

Hi everyone,

is it possible to control Esko's ArtiosCAD via Switch? We would like to convert CAD files to another file format automatically. I've already seen a configurator for Esko's Automation Engine, but we just use ArtiosCAD.

Thank you!
by PixelSwitch
Thu Mar 11, 2021 12:21 pm
Forum: Switch
Topic: sFTP send
Replies: 3
Views: 6326

Re: sFTP send

Hi everyone, I am testing Switch 2020 Fall at the moment and I also have the issue that SFTP won't connect ("internal network subsystem error: 271").I am also using a key file that works fine in FileZilla. Does anybody of you know if there is already a bug fix for that problem in Switch? T...